PRE CONSTRUCTION PROJECTS

TORONTO'S NEWEST CONDO LAUNCH!

popupmapa
aspenwite

CROSSTOWN

by ASPEN RIDGE homes

CROSSTOWN Condos is the newest Pre Construction launching in 2019 by Aspen Ridge Homes. This new Development will be located at Don Mills and Eglinton. This site will also be located by the Light Rail Transit (LRT).

NEW MASTER PLAN COMMUNITY

REGIONAL PUBLIC TRANSIT

DRAMATIC LANDSCAPES

FAMILY ORIENTED NEIGHBORHOOD

MAIN STREET RETAIL

PLATINUM ACCESS

Register today to have FIRST access to floor plans and VIP Pricing for this investment opportunity

With the impending opening of the Crosstown LRT in 4 years, a consortium of developers are reimagining the area as a complete community with the Wynford Green master plan, a redevelopment of the current Celestica property on the northwest corner of the intersection.

26060-91002

 Earlier this year during a review of the master plan at the Design Review Panel (DRP), the Panel pushed the design team to develop more innovative approaches to the public realm, heritage retention, and massing of the built form. This time around, the Wynford Green team offered a rejigged plan, as well as further details on its future implementation.

 

The main revisions to the proposal involved some shuffling around of the massing of the buildings, a tweaking of the design of the public realm, and adjustments to the incorporation of the heritage buildings in the development. Some reorganization of the street grid was done as a result of these changes. The majority of the main components remained the same, such as the community hub, retail Main Street, and low-rise townhouse development, with slight adjustments to their size and form.

masterplan

The incorporation of the heritage elements has changed significantly since the last iteration of the master plan. Currently existing on the site is the 1954-built Celestica building at 844 Don Mills Road, formerly the head offices of IBM and currently a listed building on the Toronto Heritage Register, as well as a second office building constructed in 1967 by Modernist architect John B. Parkin located at 1150 Eglinton Avenue East. The previous proposal would have retained the two main entrance portals of 844 Don Mills and relocated them to Wynford Drive, where they would have acted as a gateway into the neighbourhood, while a small portion of 1150 Eglinton would have been retained to house a community hub.

The two entrance portals of 844 Don Mills have now been incorporated into the podiums of the towers on the east side of the site, located along the private retail street envisioned as the 'Main Street' of the neighbourhood.

 

At 1150 Eglinton, the entire south facade of the building is being retained, and will act as cladding for the podium of three new towers that will fit within the footprint of the previous structure. Portions of the retained facade will be freestanding, creating a permeable wall between the public spaces in the courtyards and the street, framing the view of the city skyline to the south.

ww
29318-101300
29318-101302

As a result of the reconfiguration of the heritage structures, the public realm has also been modified and expanded. The retention of the facade of the Parkin building has created new courtyard spaces between the towers that spill out into the ravine, while to the north, Street 'D' and Street 'C' have been reconfigured such that the road on the north side of the three towers only acts as a driveway to access the parking garages, and is more pedestrian-friendly. The public 'Blufftops' park at the southwest corner of the site overlooking the ravine has been shifted eastward to be more central to the neighbourhood, while still providing connections to the new courtyards which lead down into the ravine.

 

A new element to the project is a cycling bridge over the train tracks along the north side of the site, which will connect the Leaside Spur Trail - which currently dead ends on the north side of the tracks - to Wynford Drive, and onward along a new path leading down into the ravine. The main public park has remained in its original position at the northeast corner of the site, adjacent to the new arena and community complex and at the northern terminus of the private retail street, so as to capitalize on the programmatic opportunities. As well, the public plaza at the southeast corner of the site has been kept in its original location, albeit reconfigured and expanded.

The final major change to the master plan is a reorganization of the massing. As previously mentioned, three towers are located on the site of the Parkin building where previously there was one, rising to 20, 42, and 52 storeys. The towers and mid-rises on the east side of the proposal have remained relatively intact, with some adjustments to building and podium heights to provide a better transition to the adjacent low-rise buildings. In response to the Panel's previous comments on incorporating more mid-rises into the development, a new mid-rise building has been located along Eglinton Avenue to the south, which would continue the mid-rise border of the site beginning on Don Mills Road.

As a result of the new massing, the number of residential units has increased from 3,887 up to 4,594, over half of which will be one-bedrooms, with the remainder as two- and three-plus-bedroom units. Total retail GFA has decreased marginally to 112,000 sq. ft., office GFA has increased slightly to 686,500 sq. ft., and total community GFA has decreased slightly to 132,000 sq. ft. The area is projected to house roughly 10,000 new residents and workers, with roughly 6 acres of new public park space.

The Wynford Green team's presentation also gave some insight into the block division and phasing of the project. Phase 1 includes the western portion of the site, encompassing the three new towers atop the heritage facade, the townhouses north of that, the reconstruction of the access road from Eglinton, and the construction of Celestica's new offices at the corner of Don Mills and Eglinton. Phase 2 includes the mid-rise component at the south end of the site, the townhouses on the north half of the site, the new arena and community hub, and the new public park at the northeast corner of the site. Phase 3 includes the 'Main Street' retail promenade along with its bordering towers and mid-rise buildings, while Phase 4 would be the final mid-rise office building to the east along Don Mills Road.

29318-101310
29318-101313

The master plan was praised for its "numerous opportunities to go from park, to parkette, to main street, to local street, to dramatic landscapes, to regional public transit" all in one, with several Panelists claiming it would be "a great place to raise a family". One Panel member urged designers to "not just create a complete community in itself, but to create something that draws people in from outside". They elaborated further and suggested including smaller parkettes and plazas sprinkled throughout the public realm, rather than focusing solely on large, centralizing public parks, as these would provide a greater diversity of spaces and uses for the local residents. They would be a "huge addition and boon to the livability of the site and its prosperity" and are the elements that "can really make a community that's home".

29318-101314
walk
towns

Min Drive Downtown

Min Walk To Transit

Min to highway

Have any questions about this project?

P R E V I O U S . P R O J E C T S

charles

A 47-storey icon on the north-west corner of Church & Charles. Combining striking modern architecture with charming heritage buildings, you will discover a brilliant fusion of luxury and sentiment in an exciting landmark location.

west

West is King. Rising from the grounds of historic 89 Niagara Street, WEST is a boutique condominium complex culminating in two 12- and 14-storey towers. Its striking modern design acknowledges existing local architectural motifs as its inviting common areas complement the community appeal of the neighbourhood.

158

158 Front St E is a new condominium development currently in pre-construction at Front Street and Sherbourne Avenue in Toronto, Ontario by Cityzen Development Group and Fernbrook Homes. This mixed-use development is still in its approval process for two towers of 27 storeys connected by a four storey bridge element at the top designed by architectsAlliance. Completed in 2017

sugarwharf_Logo

Sugar Wharf Condos is a new condo Toronto project by Menkes at 95 Lakeshore Boulevard East, Toronto ON M5E 1Z2. Phase one is scheduled for completion in 2022. Sales for available units are starting from the High $400,000’s with phase one will have 1500 units in 70 & 64 storey towers and phase two will have 1927 units in 77, 87, and 90 storey towers. It will also house a public school. The existing heritage LCBO headquarters will be preserved and integrated into the redevelopment. Located on Toronto’s Waterfront, Sugar Wharf Condos is everything you’ve been dreaming of.

bp

Harbour Plaza condos in downtown Toronto’s vibrant South Core Financial District is a spectacular mixed-use community – a unique integration of live-work-shop- play. Harbour Plaza’s two soaring towers are complemented by fantastic retail options at the podium of the towers, in addition to the One York commercial office tower.

An iconic landmark on the downtown skyline, Harbour Plaza is graced with soaring architecture by award-winning Peter Clewes of architectsAlliance, incomparable lifestyle amenities impeccably designed by Cecconi Simone to offer the ultimate in vibrant urban living, and a superb collection of modern urban suite designs, all directly connected to the extensive PATH network.

yc

York condos offers a wide selection of 1, 2, and 3 bedroom suites, designed with urban flair and embellished exquisite finishes, with three towers at varying heights that feature alluring outdoor spaces. Every suite offers the ultimate in elegant urban living. Open concept layouts and natural radiance from floor to ceiling glass windows lend an aura of spacious luxury. Bright, airy interiors are detailed with an exceptional standard of craftsmanship and the latest contemporary styles, accents and upscale finishes. Gourmet kitchens with sleek counters and cabinetry, oversized living areas and sumptuous master bedrooms ensure a luxurious lifestyle.

studio

Entertainment District. It's not Queen West. It's not King West. It's Richmond. Richmond & Duncan. A bit of both worlds, yet a world entirely unto itself. It's where Financial and Cultural Districts converge, creating a swirling dynamic of dollar bills and big city thrills traded on the most important index of all – quality of life.

Meet the Experts

eu

Eugenia Leung

Ho_Raymond

Raymond Ho

ste

Stephen Li

Aaron Li

Aaron Li

Contact Us

Please enter your name.
Please enter a message.